A practical guide to resistivity survey equipment: resistivity meters, single and multi-channel systems, electrodes, cables, switching units, power supplies and field checks for reliable data.

By Quantum Geoconsultants geophysics teamUpdated 20 November 20263 min read
TopsoilLava flowFractured lava flowWater between lava flowsOlder lavas & tuffs Resistivity survey Methods chosen for your target

📡 Geophysical Surveys: a technical article by the Quantum Geoconsultants geophysics team.

A resistivity survey is only as good as the equipment and the care taken with it. The same site can give clean, repeatable data with well-maintained gear, or noisy, misleading curves with a damaged cable and dry electrodes. This guide explains the main pieces of resistivity survey equipment, what each does and how to keep it working in East African field conditions.

The basic system

Every resistivity measurement needs four things: a way to inject current, a way to measure voltage, electrodes in contact with the ground, and cables to connect them.

Component Function
Transmitter Sends a controlled current into the ground through the current electrodes (A and B)
Receiver Measures the voltage between the potential electrodes (M and N)
Electrodes Metal stakes that make electrical contact with the ground
Cables Connect electrodes to the instrument; may be single wires or multi-core spreads
Power supply Batteries or a generator, depending on output needed

In most modern instruments, the transmitter and receiver are combined in one resistivity meter that calculates the resistance (voltage divided by current) automatically.

Types of resistivity meters

Single-channel meters

These take one measurement at a time. They are ideal for vertical electrical sounding (VES) for borehole siting, where the operator moves the electrodes outward after each reading. They are portable, robust and relatively affordable.

Multi-electrode systems

For 2D ERT, dozens of electrodes are laid out along a line and connected to a switching unit. The instrument automatically selects different electrode combinations and records hundreds of readings without moving anything.

Multi-channel systems

Multi-channel receivers measure several potential pairs at once for each current injection, speeding up surveys considerably. They are common on large ERT and IP projects.

Combined resistivity and IP

Many instruments also measure chargeability, allowing induced polarisation surveys with the same layout.

Key specifications

Electrodes

Stainless steel stakes, typically 30 to 50 cm long, are standard. Things to know:

Cables and reels

For VES, long single-core cables on reels carry current to the outer electrodes, sometimes hundreds of metres. For ERT, multi-core cables have take-outs at set intervals for each electrode.

Power supply

Most meters run on 12 V batteries. Large spacings or very resistive ground may need external high-voltage boosters or generators. Carry spare charged batteries and protect them from heat.

Supporting equipment

Field quality checks

  1. Check contact resistance before each reading or line.
  2. Look at the standard deviation or repeat error reported by the meter.
  3. Plot VES curves in the field; a jump or spike usually means a bad reading worth repeating.
  4. Repeat a few readings at the end of the day to confirm stability.
  5. Record nearby features: power lines, fences, pipes, tanks.

Our article on apparent and true resistivity explains what the readings represent once collected.

Safety

Resistivity meters can output hundreds of volts. Keep people and animals away from electrodes during measurements, use clear signals before injecting current, and never touch electrodes or bare connectors while the instrument is transmitting.

How Quantum Geoconsultants can help

We run VES, ERT and IP surveys with calibrated, well-maintained equipment and experienced field teams. See our geophysical surveys in Kenya, ERT surveys and surveys in Somalia.

Frequently asked questions

What equipment is needed for a resistivity survey?

A resistivity meter (transmitter and receiver), at least four electrodes, insulated cables or multi-core cable spreads, a power source, measuring tapes or GPS, and hammers. 2D ERT surveys add a switching unit or multi-electrode system.

What electrodes are used in resistivity surveys?

Stainless steel stakes are standard for current and potential electrodes. Non-polarising porous pot electrodes are sometimes used for potential measurements in IP and self-potential work.

Why do resistivity readings become noisy?

Common causes are poor electrode contact in dry ground, damaged cables, too little current, nearby power lines or metal fences, and wet connectors leaking current.

📡 Request a geophysical survey quote

The cost of a geophysical survey depends mainly on the area or length of survey lines, the methods and depth of investigation needed, and site access. Tell us about your project and we will propose a survey design and quotation.

We reply with a proposed survey design and quotation. Prices are not listed online because every site and target is different.

Plan your geophysical survey

Tell us your site, target and depth of interest. We will recommend the right methods and send a survey design and quotation.

💬 WhatsApp