Vertical Electrical Sounding (VES) for Groundwater Exploration

A practical guide to running a VES survey for groundwater: planning, Schlumberger field procedure, data quality, curve interpretation and turning results into drilling recommendations.

By Quantum Geoconsultants geophysics teamUpdated 19 November 20262 min read
TopsoilLava flowFractured lava flowWater between lava flowsOlder lavas & tuffs Resistivity survey Methods chosen for your target

📡 Geophysical Surveys: a technical article by the Quantum Geoconsultants geophysics team.

This article is a practical companion to our guide on VES principles. It focuses on how a Vertical Electrical Sounding is actually run in the field for groundwater exploration, how data quality is controlled and how results become a drilling recommendation.

Planning the survey

Equipment

Field procedure with the Schlumberger array

  1. Mark the centre point and record its GPS position.
  2. Lay out the tape along the planned direction.
  3. Start with AB/2 of about 1 to 2 m and MN/2 small.
  4. Take readings at logarithmically spaced AB/2 values, for example 1, 1.5, 2, 3, 4, 6, 8, 10, 15, 20, 30, 40, 60, 80, 100, 150, 200 m.
  5. Increase MN when the voltage becomes too small, taking overlapping readings at two MN values to tie the curve segments.
  6. Plot the curve in the field as you go, so bad points can be repeated.

Controlling data quality

Interpretation

  1. Inspect the curve shape (H, K, A, Q types) for a first idea of layering.
  2. Use inversion software to fit a layered model.
  3. Test alternative models, because equivalence allows different layer combinations to fit equally well.
  4. Translate resistivities into geology using local knowledge and borehole logs.

See interpretation of resistivity profiles for aquifer identification.

Typical interpretations in East Africa

From results to a drilling recommendation

The hydrogeologist ranks the sounding points by aquifer thickness, resistivity and depth, combined with geological reasoning, and recommends the best point, an expected water-bearing depth and a drilling depth. Uncertainty should be stated honestly.

When to combine VES with other methods

Where water is in narrow vertical fractures, VES alone may miss the target. Combining it with ERT, profiling or electromagnetic traverses greatly improves success.

How Quantum Geoconsultants can help

We run VES and ERT surveys and prepare reports for WRA applications. See hydrogeological surveys in Kenya and geophysical surveys.

Frequently asked questions

How long does a VES take?

A single sounding to moderate depth usually takes one to two hours, depending on spread length, terrain and data quality.

How many VES points are needed?

Usually several, often three to six or more on a site, so that candidate points can be compared and ranked.

Can VES give an exact drilling depth?

It gives an estimate of layer depths. The final depth is confirmed from drilling, water strikes and airlift yields.

📡 Request a geophysical survey quote

The cost of a geophysical survey depends mainly on the area or length of survey lines, the methods and depth of investigation needed, and site access. Tell us about your project and we will propose a survey design and quotation.

We reply with a proposed survey design and quotation. Prices are not listed online because every site and target is different.

Plan your geophysical survey

Tell us your site, target and depth of interest. We will recommend the right methods and send a survey design and quotation.

💬 WhatsApp