A borehole’s yield cannot be judged from drilling alone. A pumping test (also called aquifer testing or test pumping) measures how the borehole and aquifer respond to pumping. It is the basis for choosing the right pump and setting a safe pumping rate.
What a pumping test tells you
- Sustainable (safe) yield of the borehole.
- Drawdown at different pumping rates and over time.
- Borehole efficiency and well losses.
- Aquifer properties: transmissivity and, with an observation borehole, storativity.
- Boundary effects such as limited aquifer extent or recharge.
- Water quality changes during pumping.
Types of pumping test
Step drawdown test
The borehole is pumped at several increasing rates, each for a fixed period, often about an hour or more. The results show how drawdown increases with rate and how efficient the borehole is. See step drawdown and constant discharge tests.
Constant rate (constant discharge) test
The borehole is pumped at a steady rate, usually for 24 to 72 hours, while water levels are measured at increasing intervals. This test gives aquifer properties and shows whether drawdown stabilises.
Recovery test
After pumping stops, water level recovery is measured. Recovery data are often more reliable than pumping data because they are not affected by pump fluctuations.
Equipment
- A submersible pump with capacity above the expected test rates
- A gate valve to control discharge
- A flow meter or calibrated container to measure discharge
- A dip meter or pressure transducer and data logger
- A discharge pipe long enough to carry water away from the borehole
- Field meters for conductivity, temperature and pH
Procedure
- Measure the static water level before pumping.
- Install the pump below the expected dynamic level.
- Run the step test, keeping each rate constant.
- Allow recovery, then start the constant rate test.
- Measure water levels frequently at first (every minute) and then at longer intervals.
- Measure discharge regularly and keep it steady.
- Take water samples near the end of the test for analysis.
- Stop pumping and record recovery until levels are close to the original.
Standards such as BS ISO 14686 and BS EN ISO 22282-4 describe good practice. See BS EN ISO 22282.
Analysis
Drawdown and recovery data are analysed using methods such as Theis, Cooper-Jacob and Theis recovery to calculate transmissivity. Step test data are analysed to separate aquifer losses from well losses. See transmissivity, hydraulic conductivity and storativity.
Setting the safe yield
The recommended pumping rate keeps the dynamic water level safely above the pump and the top of the screens, allows for seasonal decline and long-term effects, and avoids drawing in poor-quality water. It is usually lower than the maximum test rate.
Common mistakes
- Relying on airlift yield instead of a pumping test.
- Tests too short to show the long-term trend.
- Unsteady discharge rates.
- Discharging water too close to the borehole so it recirculates.
- No recovery measurements.
How Quantum Geoconsultants can help
We carry out and analyse pumping tests and use the results to size pumps and solar systems. See borehole drilling, pump installation and water levels and drawdown.
Frequently asked questions
Why is a pumping test needed?
It measures how much water a borehole can sustainably supply and how the water level responds, which is essential for choosing the pump and setting the pumping rate.
How long is a pumping test?
A typical programme includes a step drawdown test of a few hours and a constant rate test of 24 to 72 hours, followed by recovery monitoring.
Is an airlift yield the same as a pumping test?
No. Airlift yields during drilling are only an indication. A proper pumping test with a submersible pump gives reliable data.
💧 Water demand calculator
How much water does your borehole need to deliver each day? Enter your numbers for a quick planning estimate.
Rough planning figures only, using typical daily use per person and per animal, with one day of storage and about 6 hours of good sun. Your test pumping result sets the final pump size.
Send these numbers on WhatsAppGet a borehole quote for Kenya
Send us your location. We will advise on the survey, permits, expected depth and the full cost up to a working solar borehole.