BS EN ISO 22282 sets out how to carry out geohydraulic testing, field tests that measure the permeability of soil and rock. These tests are essential for dewatering, dam foundations, tunnels, landfills and groundwater studies. This article summarises the standard and when each test is used.
The parts of the standard
- Part 1: general rules
- Part 2: water permeability tests in a borehole using open systems
- Part 3: water pressure tests in rock
- Part 4: pumping tests
- Part 5: infiltrometer tests
- Part 6: water permeability tests in a borehole using closed systems
Part 1: general rules
Sets out principles common to all tests: planning, equipment calibration, measuring water levels and flows, recording and reporting. It emphasises understanding the ground conditions, as test results depend on the volume of ground tested.
Part 2: open system borehole tests
Commonly called falling head and rising head tests. Water is added to or removed from a borehole or standpipe, and the change in level over time is measured. The rate of return to equilibrium gives the permeability of the soil around the test section.
- Simple and widely used in site investigations.
- Tests a relatively small volume of ground.
- Useful for soils and weak rocks.
Part 3: water pressure tests in rock (Lugeon tests)
A section of borehole in rock is isolated with inflatable packers and water is injected at several pressure stages. The flow rate at each stage is recorded. Results are expressed in Lugeon units, where one Lugeon equals a flow of 1 litre per minute per metre of test section at a pressure of 10 bar.
- Essential for dam foundations and grouting design.
- The pattern of flow across pressure stages shows whether fractures are opening, washing out or clogging.
Part 4: pumping tests
Covers pumping from a well while measuring drawdown in it and in observation wells. Pumping tests measure the properties of a large volume of aquifer and are the most reliable method for water supply and large dewatering schemes. See pumping tests in groundwater investigations.
Part 5: infiltrometer tests
Measures infiltration rates at the ground surface using single or double ring infiltrometers. Used for soakaways, stormwater infiltration, irrigation and recharge studies.
Part 6: closed system tests
Tests where the test section is sealed and pressure changes are measured, suitable for low-permeability soils and rocks where open tests would be too slow.
Choosing the right test
| Need | Suitable test |
|---|---|
| Permeability of soil for excavation design | Falling or rising head (Part 2) |
| Rock mass permeability for a dam | Lugeon packer test (Part 3) |
| Aquifer properties for water supply or dewatering | Pumping test (Part 4) |
| Infiltration for soakaways | Infiltrometer (Part 5) |
| Very low permeability ground | Closed system test (Part 6) |
Practical tips
- Clean the borehole before testing; smeared walls give low results.
- Seal test sections properly to avoid leakage around packers.
- Record equilibrium water levels before and after tests.
- Interpret results with the geology: a single test may not represent a whole site.
How Quantum Geoconsultants can help
We carry out permeability, packer and pumping tests as part of geotechnical and hydrogeological investigations. See groundwater monitoring, aquifer properties and our geotechnical surveys.
Frequently asked questions
What is geohydraulic testing?
It is field testing to measure how easily water flows through soil and rock, used for dewatering, seepage, dam and groundwater design.
What is a Lugeon test?
A water pressure (packer) test in rock where water is injected into a sealed section of borehole. One Lugeon is a flow of 1 litre per minute per metre at 10 bar.
Which part covers pumping tests?
Part 4 of BS EN ISO 22282 covers pumping tests.
💧 Water demand calculator
How much water does your borehole need to deliver each day? Enter your numbers for a quick planning estimate.
Rough planning figures only, using typical daily use per person and per animal, with one day of storage and about 6 hours of good sun. Your test pumping result sets the final pump size.
Send these numbers on WhatsAppGet a borehole quote for Kenya
Send us your location. We will advise on the survey, permits, expected depth and the full cost up to a working solar borehole.