Groundwater affects almost every part of geotechnical design, yet it is one of the easiest things to get wrong in a site investigation. A water level written on a borehole log during drilling is often not the real groundwater level. This article explains why groundwater monitoring matters and how it is done.
Why groundwater matters
- Bearing capacity and settlement: water reduces effective stress, lowering soil strength and stiffness.
- Excavations: water can cause base heave, piping, running sand and unstable sides.
- Basements: high water pressure causes uplift and needs waterproofing and anchorage or weight.
- Slopes and retaining walls: water pressure is a major cause of failures.
- Durability: saline or sulphate-rich groundwater attacks concrete and steel.
- Expansive clays: changes in moisture cause swelling and shrinkage.
Why drilling observations are not enough
During drilling, the borehole may be filled with water used for flushing, or water may seep in so slowly from clays that the level has not had time to rise. Casing may seal off water-bearing layers. Good logs record water strikes, the rise over 20 minutes and levels at the start and end of each shift, but these remain only an indication.
Monitoring installations
Standpipes
A slotted pipe surrounded by gravel over much of the borehole length. Simple and cheap, it shows the general water level but can connect different layers.
Standpipe piezometers
A filter tip is installed in sand at a chosen depth and sealed above and below with bentonite, so it measures the water pressure in one layer only. Several piezometers at different depths reveal perched water, downward drainage or artesian pressure.
Vibrating wire piezometers and loggers
Electronic sensors measure pore pressure and can be connected to data loggers to record changes continuously, useful in low-permeability clays, slopes and during construction.
Reading and recording
Levels are measured with an electric dip meter from a fixed reference point, and the reference level is surveyed. Readings are taken until levels stabilise, and then regularly, ideally covering a full wet season. In East Africa’s two rainy seasons, groundwater can rise several metres, which may control basement and excavation design.
Permeability testing
Monitoring installations can also be used for falling or rising head permeability tests, giving data for dewatering design. Larger schemes may need pumping tests, as used in groundwater investigations. See also BS EN ISO 22282 geohydraulic testing.
Water sampling
Groundwater samples are tested for sulphates, chlorides and pH to classify the aggressiveness of the environment to concrete, and sometimes for contamination on brownfield sites.
Using the results
- Setting the design groundwater level, usually a cautious high level including seasonal rise.
- Choosing excavation methods and dewatering systems.
- Designing basements against uplift and water ingress.
- Specifying concrete class and cover.
- Assessing slope stability.
Local examples
- Coastal sites in Mombasa and Mogadishu often have shallow saline groundwater that affects excavations and concrete.
- River valleys such as the Shabelle and Juba have high, fluctuating water tables.
- Volcanic areas can have perched water above clay or tuff layers.
How Quantum Geoconsultants can help
We install standpipes and piezometers, carry out permeability tests and monitor groundwater as part of our investigations, and we bring hydrogeological expertise to interpretation. See our geotechnical surveys, hydrogeological surveys and BS 5930 guide.
Frequently asked questions
Why is the water level during drilling not reliable?
Drilling water, slow seepage into clays and sealed layers mean the level seen during drilling may not be the true groundwater level. Monitoring over days or months gives a reliable picture.
What is a standpipe piezometer?
It is a narrow pipe installed in a borehole with a filter tip sealed at a chosen depth, so the water pressure in that layer can be measured.
How long should groundwater be monitored?
At least until levels stabilise, and ideally through a wet season, because groundwater in East Africa can rise significantly during the rains.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.
Book a geotechnical survey in Kenya
Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.