Borehole Drilling Procedures: From Site Selection to Completion

The full borehole drilling process step by step: survey, permits, mobilisation, drilling, logging, casing and screens, gravel pack, sealing, development, test pumping and handover.

By Quantum Geoconsultants hydrogeology teamUpdated 19 November 20262 min read
TopsoilLava flowFractured lava flowWater between lava flowsOlder lavas & tuffs Depth set by the survey

💧 Hydrogeology & Boreholes: a technical article by the Quantum Geoconsultants hydrogeology team.

A good borehole is the result of a series of steps done properly, not just a hole drilled deep enough. This article walks through the borehole drilling process from start to finish, so you know what good borehole construction looks like.

1. Hydrogeological survey and siting

A qualified hydrogeologist studies the geology, existing boreholes and geophysics to choose the drilling point and estimate depth, yield and water quality. See hydrogeological surveys.

2. Permits and approvals

In Kenya, the Water Resources Authority (WRA) authorises borehole drilling based on the survey report. Some projects also require environmental approval from NEMA. Drilling without authorisation risks penalties.

3. Mobilisation and site preparation

The rig, compressor, water, casing and materials are transported to site. The drilling pad must be level and accessible, and mud pits are prepared if mud rotary drilling is used.

4. Drilling

The method depends on geology. See choosing the drilling method:

The hole is usually drilled at a diameter large enough for the casing and gravel pack.

5. Logging

Cuttings are collected at regular intervals and described. Drilling rate, water strikes, airlift yields and water conductivity are recorded. Where available, geophysical logging of the open hole helps identify aquifer zones. See borehole geophysical logging.

6. Borehole design

Using the log, the hydrogeologist decides the final depth and where to place screens opposite water-bearing zones and plain casing elsewhere.

7. Casing and screen installation

Casing and screens, usually uPVC or steel, are lowered with centralisers to keep them in the middle of the hole. A sump at the bottom collects fine sediment. See casing and screen installation.

8. Gravel pack and sanitary seal

Graded gravel is placed in the annulus around the screens to support the formation and filter fines. Above the gravel, a bentonite or cement grout seal prevents surface water and contaminants entering. See gravel packing and sanitary sealing.

9. Development

The borehole is cleaned by airlifting, surging or jetting to remove drilling mud and fines and open the aquifer around the screens. Development continues until water is clear and sand-free. See borehole development.

10. Test pumping

A step drawdown test and a constant rate test, followed by recovery monitoring, establish the safe yield and the right pump setting. See step drawdown and constant discharge tests.

11. Water quality analysis

A sample is analysed for physical, chemical and microbiological parameters to confirm suitability and any treatment needs. See groundwater quality assessment.

12. Headworks and completion report

The borehole is capped and a concrete apron built to keep surface water away. A completion report with log, construction, test results and water quality is prepared and submitted to WRA as required.

13. Pump installation

Finally, the pump is selected from test pumping results and installed. See borehole pump installation.

Red flags when choosing a contractor

How Quantum Geoconsultants can help

We manage the full process from survey and WRA authorisation to drilling, test pumping and pump installation. See borehole drilling in Kenya, Somalia and hydrogeological surveys.

Frequently asked questions

How long does it take to drill a borehole?

Drilling itself often takes a few days, depending on depth and geology. The full process including survey, permits, test pumping and water testing takes longer.

Do I need a permit to drill a borehole in Kenya?

Yes. Authorisation from the Water Resources Authority is needed, supported by a hydrogeological survey report. Some projects also need NEMA approval.

What should I receive after drilling?

A completion report with the borehole log, construction details, test pumping results, water quality analysis and recommended pumping rate.

💧 Water demand calculator

How much water does your borehole need to deliver each day? Enter your numbers for a quick planning estimate.

0litres per day
0suggested tank (litres)
0pump flow (m³/hour, solar)

Rough planning figures only, using typical daily use per person and per animal, with one day of storage and about 6 hours of good sun. Your test pumping result sets the final pump size.

Get a borehole quote for Kenya

Send us your location. We will advise on the survey, permits, expected depth and the full cost up to a working solar borehole.

💬 WhatsApp