The question of how many boreholes to drill is closely tied to another: how deep should geotechnical boreholes be? Shallow boreholes miss the weak layer that causes settlement. Very deep boreholes waste money. The right depth depends on the structure, the loads and the ground. This article explains the principles engineers use.
The basic principle
A foundation spreads load into the ground. The stress it causes decreases with depth, but it remains significant to a depth related to the foundation’s width. Boreholes must reach below the zone of significant stress, so that any weak or compressible layer within it is found. They must also reach any layer that controls construction, such as groundwater or rock in an excavation.
Typical depth guidance
Eurocode 7 Part 2 and similar guidance give indicative depths. They are starting points, adjusted by the engineer.
| Situation | Indicative depth below founding level |
|---|---|
| Pad and strip footings, buildings | About 1 to 3 times the footing width, and at least a few metres |
| Raft foundations | At least about the width of the raft |
| Piles | Several metres or about 5 pile diameters below the expected toe, and enough to check the founding layer |
| Embankments | Related to embankment height and the thickness of soft ground |
| Cuttings and excavations | Below the base of excavation, considering groundwater and base stability |
| Roads and airfields | Commonly a few metres below formation level |
| Pipelines and trenches | Below invert level, usually by 1 to 2 m or more |
Where groups of foundations are close together, their stress zones overlap and the effective width is larger, so boreholes go deeper.
Proving rock
Where rock is expected, the borehole should core into it far enough to:
- Confirm it is bedrock, not a boulder or a cemented layer over softer material.
- Measure the weathering profile and rock quality, using TCR, SCR and RQD.
- Check for cavities in limestone or coral, and weak layers in volcanic sequences.
A common minimum is 3 to 5 m of coring into rock, more for piles socketed in rock and for heavily loaded structures. In coral limestone along the coast, deeper coring is often needed because cavities can occur below a strong crust.
When to go deeper
- Soft or compressible layers are found near the planned final depth.
- Black cotton soil or fill is thicker than expected.
- Loose saturated sands that may liquefy in earthquakes.
- Variable volcanic sequences, where strong lava may overlie weak tuff or old soils.
- Karst or coral limestone with possible voids.
- The structure has changed: more storeys, heavier loads or basements.
Good practice is for the engineer to review logs as drilling progresses and instruct extra depth where needed, rather than fixing all depths in advance.
When shallower may be acceptable
- Strong, uniform rock is found at shallow depth and proved by coring.
- Light structures on well known, uniform ground with good local records.
- Additional information is available from geophysics, CPT or previous investigations.
Depth and groundwater
Boreholes for basements, deep excavations and water-retaining structures must go deep enough to understand groundwater: the water table, any confined aquifers below the excavation that could cause base heave, and permeability for dewatering design. Install piezometers where groundwater matters.
Depth and in-situ testing
Depth also affects which tests can be done. SPTs are carried out at regular intervals throughout soils. In clays, undisturbed samples are taken at key depths for strength and consolidation tests. Deep boreholes need larger rigs and more time, so planning the test schedule with depth in mind is important.
Complementary methods
Geophysics can extend information between and below boreholes. MASW and seismic refraction show stiffness and depth to rock; ERT can highlight clay or cavities. CPT gives continuous profiles in soft ground. These methods help decide where deeper boreholes are needed.
How Quantum Geoconsultants can help
Our engineers set borehole depths for each structure and adjust them on site as the ground is revealed. See our geotechnical surveys in Kenya, Somalia and our guide to high-rise investigations.
Frequently asked questions
How deep should a geotechnical borehole be for a house?
For light structures on shallow footings, investigation points often go a few metres below the expected founding level, commonly 3 to 6 m in total, but deeper where soft or expansive soils are present.
How deep should boreholes be for piles?
Below the expected pile toe level by a margin, often several metres or a multiple of the pile diameter, to confirm the founding layer and check for weaker layers below.
How do you know you have reached bedrock and not a boulder?
By coring a sufficient length into the rock, often at least 3 to 5 m, and comparing levels across several boreholes. Boulders usually give short lengths of strong rock over softer material.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.
Book a geotechnical survey in Kenya
Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.