High-rise buildings place large, concentrated loads on the ground, often with deep basements beneath. A small site investigation that would be fine for a house is not enough. This article explains the geotechnical investigation requirements for high-rise buildings and why each element matters.
Why high-rise buildings need more investigation
- Foundation loads are much higher and stress reaches deeper into the ground.
- Differential settlement can tilt or crack a tall structure.
- Basements need excavation support, groundwater control and protection against uplift.
- Neighbouring buildings and roads can be affected by excavation and dewatering.
- Seismic design requires knowledge of ground stiffness.
Under Eurocode 7, most high-rise buildings fall into Geotechnical Category 2 or 3, requiring thorough investigation and specialist design.
Number and spacing of boreholes
Eurocode 7 Part 2 suggests investigation points at roughly 15 to 40 m spacing for high-rise and industrial structures, with closer spacing where the ground is variable. In practice, a tower footprint usually needs boreholes at or near each corner and in the centre, with extra holes where geology changes, for example across the edge of a volcanic flow or a filled valley.
Depth of investigation
Boreholes must go deep enough to cover all strata that will be stressed by the foundations:
- For raft foundations, Eurocode 7 guidance suggests depths of at least about 1.5 times the raft width below foundation level, unless competent rock is reached sooner.
- For piled foundations, investigation should extend at least about 5 m, and several pile diameters, below the expected pile toe level, and further if weaker layers may lie beneath.
- Where rock is relied on, rock coring should prove that it is bedrock and not a boulder or a thin hard layer over weaker material.
Field testing
- SPTs at regular intervals in soils.
- Rock coring with TCR, SCR and RQD and point load testing.
- Pressuremeter or plate load tests where stiffness is critical.
- Permeability tests for basement dewatering design.
- MASW and seismic surveys for shear-wave velocity and seismic site classification. See Vs30 and seismic site classification.
- Geophysics to check for cavities, faults or buried channels between boreholes, especially in coral limestone and volcanic areas.
Laboratory testing
Strength and stiffness parameters for design come from triaxial and consolidation tests on good-quality samples, plus classification, swell and chemical tests. Concrete in basements and piles needs to be designed for the sulphate and chloride levels measured. See BS 1377 laboratory tests.
Groundwater
Groundwater controls basement design, excavation stability and long-term uplift. Standpipe piezometers should be installed and monitored, ideally through a wet season. Perched water, artesian pressure and seasonal rise must all be understood. See groundwater monitoring during investigations.
Basements and excavations
Basement design needs data on soil strength for retaining walls, groundwater levels and permeability for dewatering, and the ground’s response to unloading. The investigation should also record the foundations of neighbouring buildings and services, so that movements can be predicted and monitored.
Foundation options
Depending on ground conditions, high-rise towers in East Africa are founded on rafts on stiff ground or rock, bored piles to rock or dense strata, or piled rafts that share load between raft and piles. The investigation must provide parameters for whichever options are considered, so the most economical solution can be chosen.
Common local challenges
- Nairobi: variable volcanic soils and tuffs, black cotton soil in the east, and occasional voids or weak horizons.
- Mombasa and the coast: coral limestone with cavities, and saline groundwater.
- Mogadishu: coastal sands over variable limestone, and shallow saline groundwater.
- Rift Valley towns: faults, fissures and loose volcanic ash.
How Quantum Geoconsultants can help
We design and carry out investigations for multi-storey and high-rise developments, combining deep drilling, coring, in-situ testing, geophysics and laboratory work. See our geotechnical surveys in Nairobi, Mombasa, Mogadishu and geophysical surveys for construction.
Frequently asked questions
How deep should boreholes be for a high-rise building?
Deep enough to cover all ground affected by the foundations. For rafts this is often at least one and a half times the raft width, and for piles at least several metres below the expected pile toe.
Do high-rise buildings need seismic site classification?
Yes, in seismically active regions. Shear-wave velocity measurements such as MASW are used to classify the site for seismic design.
Why are basements a geotechnical challenge?
Basements involve deep excavations, retaining walls, groundwater control and possible uplift, all of which need site-specific ground data.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.