How Many Boreholes Does a Geotechnical Investigation Need?

How engineers decide the number, spacing and depth of geotechnical boreholes for houses, buildings, roads, tanks and linear projects, with typical guidance and the factors that change it.

By Quantum Geoconsultants geotechnical teamUpdated 20 November 20263 min read
Black cotton soil: swells & shrinksFirmer weathered layerRock Core box Know your ground before you build

🏗️ Geotechnical Engineering: a technical article by the Quantum Geoconsultants geotechnical team.

One of the first questions on any site investigation is how many boreholes are needed. Clients want the smallest number that keeps costs down; engineers want enough to understand the ground. Too few, and expensive surprises appear during construction. Too many, and money is wasted. This article explains how the number, spacing and depth of exploratory holes are decided.

The guiding principle

An investigation must give enough information to design the foundations safely and economically, and to plan construction. Eurocode 7 and BS 5930 do not give one fixed number. They give guidance that is then adjusted to:

Typical spacing guidance

Commonly used guidance, such as that in Eurocode 7 Part 2, suggests indicative spacings. These are starting points that the engineer adjusts:

Type of structure Indicative spacing of investigation points
High-rise and industrial buildings Grid of about 15 to 40 m
Large-area structures (warehouses) Grid of not more than about 60 m
Linear structures (roads, railways, pipelines, canals) About 20 to 200 m along the route
Special structures (bridges, towers, tanks) Two to six points per foundation
Dams and embankments About 25 to 75 m along relevant sections

For a small house, two or three points, placed under the footprint and spread across it, are a typical minimum. See our article on soil tests before building a house.

How deep should the boreholes go?

Depth matters as much as number. Boreholes must go deep enough to cover the zone of ground stressed by the foundations, plus a margin. General guidance includes:

Our article on investigations for high-rise buildings covers deep foundations in more detail.

Factors that increase the number

Combining methods to save money

Boreholes are not the only tool. A cost-effective investigation usually combines:

Geophysics is especially useful for large sites and for detecting cavities, rock head variation and soft zones that boreholes might miss.

Phased investigation

On larger projects, the investigation is often carried out in phases: a preliminary phase with a few boreholes to understand the ground, then a design phase with more points placed where they are most needed. Phasing usually gives better information for the same cost.

Where to place the boreholes

Set out positions with a GPS or total station and record coordinates and ground levels.

Warning signs of too few boreholes

How Quantum Geoconsultants can help

We design investigation layouts that balance cost and risk, combining boreholes, trial pits, probing and geophysics. See our geotechnical surveys in Kenya, Somalia and our guide on how to read a geotechnical report.

Frequently asked questions

How many boreholes are needed for a building?

It depends on the building size, loads and how variable the ground is. Small buildings commonly need at least two or three exploratory points; larger buildings are investigated on a grid with typical spacings of about 15 to 40 m, refined by the engineer.

Can trial pits replace boreholes?

For light structures with shallow foundations, trial pits can provide much of the information needed. For deeper foundations, heavy loads, groundwater or rock, boreholes are needed to reach sufficient depth.

Is one borehole enough for a site?

Rarely. One borehole tells you about one point. Ground often changes across even a small plot, and without at least two or three points you cannot see that variation.

🏗️ Request a geotechnical survey quote

The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.

Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.