One of the first questions on any site investigation is how many boreholes are needed. Clients want the smallest number that keeps costs down; engineers want enough to understand the ground. Too few, and expensive surprises appear during construction. Too many, and money is wasted. This article explains how the number, spacing and depth of exploratory holes are decided.
The guiding principle
An investigation must give enough information to design the foundations safely and economically, and to plan construction. Eurocode 7 and BS 5930 do not give one fixed number. They give guidance that is then adjusted to:
- The size and shape of the structure.
- The loads and sensitivity to settlement.
- How variable the ground is expected to be.
- The consequences of failure: a hospital needs more certainty than a store shed.
- What is already known from previous investigations nearby.
Typical spacing guidance
Commonly used guidance, such as that in Eurocode 7 Part 2, suggests indicative spacings. These are starting points that the engineer adjusts:
| Type of structure | Indicative spacing of investigation points |
|---|---|
| High-rise and industrial buildings | Grid of about 15 to 40 m |
| Large-area structures (warehouses) | Grid of not more than about 60 m |
| Linear structures (roads, railways, pipelines, canals) | About 20 to 200 m along the route |
| Special structures (bridges, towers, tanks) | Two to six points per foundation |
| Dams and embankments | About 25 to 75 m along relevant sections |
For a small house, two or three points, placed under the footprint and spread across it, are a typical minimum. See our article on soil tests before building a house.
How deep should the boreholes go?
Depth matters as much as number. Boreholes must go deep enough to cover the zone of ground stressed by the foundations, plus a margin. General guidance includes:
- For pad and strip footings, depth below founding level of at least about one to three times the footing width, depending on the type of foundation and loads.
- For rafts, depth of at least about the width of the raft, unless rock is found first.
- For piles, several metres below the expected pile toe, or a multiple of the pile diameter, to check the founding stratum.
- Where rock is found, enough coring (often at least 3 to 5 m) to confirm it is bedrock and not a boulder.
- Deeper boreholes where soft or compressible layers may exist below.
Our article on investigations for high-rise buildings covers deep foundations in more detail.
Factors that increase the number
- Variable geology: volcanic sequences, karst, old river channels, fill.
- Sloping sites and cut-and-fill platforms.
- Black cotton soil of varying thickness.
- Heavy or settlement-sensitive structures: tanks, silos, machinery foundations.
- Coastal coral limestone with possible cavities.
- Unexpected results from the first boreholes.
Combining methods to save money
Boreholes are not the only tool. A cost-effective investigation usually combines:
- Trial pits for shallow conditions, cheap and quick to log.
- Probing such as DCP or dynamic probes between boreholes to check consistency.
- CPT for continuous profiles in soft and sandy ground.
- Geophysics such as MASW, ERT or seismic refraction to see between boreholes. See geophysics in geotechnical investigations.
Geophysics is especially useful for large sites and for detecting cavities, rock head variation and soft zones that boreholes might miss.
Phased investigation
On larger projects, the investigation is often carried out in phases: a preliminary phase with a few boreholes to understand the ground, then a design phase with more points placed where they are most needed. Phasing usually gives better information for the same cost.
Where to place the boreholes
- At the corners and centre of the building footprint.
- At heavily loaded points such as columns, cores, tanks and lift pits.
- Where the ground may change, such as across a slope or near a valley.
- Outside the footprint for retaining walls, excavations and drainage.
Set out positions with a GPS or total station and record coordinates and ground levels.
Warning signs of too few boreholes
- A large building with one or two boreholes in one corner.
- Boreholes that stop before reaching a reliable founding layer.
- No investigation where piles or deep basements are planned.
- Large differences between the few boreholes, with no further work to explain them.
How Quantum Geoconsultants can help
We design investigation layouts that balance cost and risk, combining boreholes, trial pits, probing and geophysics. See our geotechnical surveys in Kenya, Somalia and our guide on how to read a geotechnical report.
Frequently asked questions
How many boreholes are needed for a building?
It depends on the building size, loads and how variable the ground is. Small buildings commonly need at least two or three exploratory points; larger buildings are investigated on a grid with typical spacings of about 15 to 40 m, refined by the engineer.
Can trial pits replace boreholes?
For light structures with shallow foundations, trial pits can provide much of the information needed. For deeper foundations, heavy loads, groundwater or rock, boreholes are needed to reach sufficient depth.
Is one borehole enough for a site?
Rarely. One borehole tells you about one point. Ground often changes across even a small plot, and without at least two or three points you cannot see that variation.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.