A perfect design is useless if it is built in the wrong place. Setting out transfers the design from drawings to the ground, marking positions and levels for the builders. This article explains the principles and procedures of construction surveying.
Principles of setting out
- Work from established control: use the project’s control points and benchmarks.
- Use the design coordinate system: ensure drawings and control match.
- Check independently: every critical setting out should be verified by a different method or from different control.
- Protect marks: set reference pegs outside the working area.
- Record: keep records of what was set out, when and by whom.
Preparation
- Review drawings and resolve inconsistencies with the designer.
- Compute setting out coordinates and levels.
- Check the control points on site.
- Agree tolerances with the engineer or contractor.
Methods
Total station radial method
The instrument is set on a control point and oriented to another. Design coordinates are entered and the instrument guides the operator to each point. Accurate and widely used for buildings and structures.
Free station (resection)
The instrument is set up anywhere with good visibility and its position is calculated from several control points. Flexible on busy sites.
RTK GNSS
Efficient for roads, earthworks, pipelines and large open sites. Less suitable near tall structures or where millimetre precision is needed.
Levelling
Levels are transferred from benchmarks to pegs, profiles and formwork using a level or total station.
Building setting out
- Set out main grid lines or corners from control.
- Check diagonals and dimensions.
- Establish profiles (batter boards) outside the excavation, with lines marking walls and grids.
- Transfer levels for foundations, slabs and floors.
- Re-establish grid lines at each floor as construction rises.
Road and earthworks setting out
- Centreline pegs at regular chainages
- Edge and offset pegs
- Batter pegs marking the top of cuttings and toe of embankments
- Level control for each layer, checked against design
Machine control systems can guide graders and excavators directly from the design model. See surveys for road design.
Drainage and pipelines
Pipes need correct line and gradient. Sight rails and lasers set inverts; levels are checked frequently, because small errors can reverse falls.
Tolerances
Allowable deviations depend on the structure and specification. Building setting out typically requires accuracy of a few millimetres, while earthworks allow larger tolerances. Tolerances should be defined before work starts.
Checking and as-built surveys
Key setting out is checked before concrete is poured. After construction, as-built surveys record actual positions and levels, verifying compliance and supporting future maintenance.
How Quantum Geoconsultants can help
We provide control networks, setting out and as-built surveys for construction projects. See construction site surveys and accuracy and quality control.
Frequently asked questions
What is setting out?
Marking on the ground the exact positions and levels of structures and works shown on the design drawings.
Which instrument is best for setting out buildings?
A total station is usually preferred for buildings because of its precision. RTK GNSS is efficient for roads and earthworks on open sites.
Why must setting out be checked?
A single mistake can place a structure in the wrong position or at the wrong level, which is costly to correct. Independent checks catch errors before construction proceeds.
📐 Request a topographic survey quote
The cost of a topographic survey depends mainly on the size of the site, the level of detail needed, the ground cover and whether a drone can be used. Tell us about your site and we will recommend a method and send a quotation.
We reply with the recommended method, deliverables and a quotation. Prices are not listed online because every site is different.
Get a topographic survey quote
Send us your site location, its approximate size and what the survey is for. We will recommend ground or drone methods and send a quotation, including mobilisation from our Nairobi base.