A geophysical survey for construction gives engineers a continuous picture of the ground across a whole site, not just at a few boreholes. In Kenya, where depth to rock can change sharply, black cotton soil and weathered tuffs vary in thickness, and voids or faults can hide between test points, it is one of the most cost-effective parts of a subsurface investigation.
Why use geophysics in a subsurface investigation?
A study of structural defects in Nairobi found highly variable subsoils, including expansive tuffs, soft clays and red soils containing cavities, often of variable thickness, and showed that wider site investigation significantly reduces the risk of foundation failure. Geophysics is how you widen an investigation economically: survey lines cover the whole footprint, and boreholes are then placed where they matter most.
With the National Building Code 2024 now treating geotechnical assessment as a precondition for construction, combining geophysics with our geotechnical surveys gives developers a stronger, better-documented basis for design.
Depth to bedrock surveys
Knowing how deep rock lies controls foundation type, pile lengths, excavation cost and basement design. Seismic refraction is the main tool: seismic waves travel much faster in rock than in soil, so travel times along a line of geophones reveal the rock surface. In Kenya's basement areas, refraction also helps separate large boulders from true bedrock, a common source of costly surprises.
Geophysical surveys for roads, bridges and dams
- Roads and railways: long seismic and resistivity lines map depth to rock, cut rippability, weak and wet zones, and cavities along the route. A 2022 study of the Nairobi to Malaba railway documented ground fissures formed by groundwater eroding volcanic soils.
- Bridges: depth to rock and weathering at abutments and piers, and buried channels in river beds.
- Dams and reservoirs: foundation rock quality, fractured and permeable zones, faults and possible leakage paths, before drilling and grouting are planned.
Methods we combine
What you receive
- Survey layout plan with GPS coordinates
- Interpreted 2D sections and plan maps
- Depth to bedrock and weak zones across the site
- Recommended borehole locations to confirm key features
- A report written for engineers, linked to the geotechnical investigation
Geophysical survey cost for construction projects
The cost depends mainly on the site area or total length of survey lines, the methods and depth required and access. A single plot needs far less work than a road corridor or dam site.
Ask us for a quote. Send your site location and project details and we will propose a survey design and quotation.
Frequently asked questions
Why use geophysics for construction?
Boreholes only show the ground at single points. Geophysics fills the gaps between them, showing how depth to rock, weak zones and voids change across the whole site, so fewer surprises appear during excavation and foundation work.
How is depth to bedrock measured?
Seismic refraction is the main method: rock carries seismic waves much faster than soil, so the travel times reveal the depth to rock along each line. Resistivity and boreholes are used to confirm it.
Can geophysics be used for roads, bridges and dams?
Yes. Long road and pipeline routes are surveyed with seismic and resistivity lines; bridge and dam sites need depth to rock, weathered zones, faults and leakage paths, which geophysics maps before drilling.
How much does a geophysical survey for construction cost?
It depends on the site area or line length, the methods and depth required and access. Contact us with your project details for a quotation.
References and further reading
- Zohdy A. A. R., Eaton G. P. and Mabey D. R. Application of surface geophysics to ground-water investigations (USGS Techniques of Water-Resources Investigations, Book 2, Chapter D1)
- SurfSeis: multichannel analysis of surface waves (MASW) software and user's manual (Kansas Geological Survey)
- Mandatory soil test looms for developers before construction (The Standard)
- Subsoil conditions and structural defects in Nairobi (South Eastern Kenya University repository)
- Foundation soils and ground fissures along the Nairobi to Malaba railway (Frontiers in Earth Science, 2022)
- Barasa M. et al. (2018). Africa Groundwater Atlas: Hydrogeology of Kenya. British Geological Survey
📡 Request a geophysical survey quote
The cost of a geophysical survey depends mainly on the area or length of survey lines, the methods and depth of investigation needed, and site access. Tell us about your project and we will propose a survey design and quotation.
We reply with a proposed survey design and quotation. Prices are not listed online because every site and target is different.
Plan your geophysical survey
Tell us your site, target and depth of interest. We will recommend the right methods and send a survey design and quotation.