Understanding Your Borehole Completion Report: Logs, Yield and Water Quality

How to read a borehole completion report: drilling log, construction details, water strikes, pumping test results, safe yield, water quality and the pump recommendation.

By Quantum Geoconsultants hydrogeology teamUpdated 20 November 20263 min read
TopsoilLava flowFractured lava flowWater between lava flowsOlder lavas & tuffs Depth set by the survey

💧 Hydrogeology & Boreholes: a technical article by the Quantum Geoconsultants hydrogeology team.

When your borehole is finished, the driller should give you a borehole completion report. It is easily the most important document you will own about your water supply. It tells you how deep the borehole is, what it is made of, how much water it can give and whether that water is fit for use. Many owners never read it, and many reports are too thin to be useful. Here is what each part means and what to look for.

1. General information

Keep this page; it links the borehole to its permits and to the hydrogeological survey report.

2. The drilling log

The log describes the materials drilled through, metre by metre. A typical entry might read “12 to 24 m, weathered granite, brown, friable” or “48 to 60 m, fractured basalt, water strike at 52 m”. Look for:

3. Construction details

Item What to check
Total depth Final depth drilled and depth after construction
Drilling diameters Diameter at each depth interval
Casing Material (uPVC, steel), diameter, class and depth range
Screens Depth intervals, slot size and material, matched to the water strikes
Gravel pack Size and depth interval
Sanitary seal Grout type and depth, normally in the top several metres
Headworks Casing height above ground, cap, apron slab

A simple diagram of the borehole construction should be included. If it is missing, ask for one. Our articles on casing and screen installation and gravel packing and sealing explain why these details matter.

4. Development

The report should record how the borehole was developed after construction (air-lifting, surging, jetting), for how long, and whether the water ran clear and sand-free at the end. See borehole development methods.

5. Water levels

Our guide to static and dynamic water levels and drawdown explains them in detail.

6. Pumping test results

This section is what tells you how much water you really have. A proper report includes:

Be wary of reports that give a yield without any pumping test data, or a yield based only on air-lifting during drilling. See step-drawdown and constant discharge tests.

7. Water quality

The report should include a laboratory analysis of a sample taken near the end of the pumping test, with:

If any value exceeds the standard, the report should say so clearly and recommend treatment. See groundwater quality assessment.

8. Pump recommendation

Finally, the report should recommend:

Read borehole yield and pump selection for how these numbers are used.

Warning signs of a poor report

How Quantum Geoconsultants can help

Every borehole we drill comes with a full completion report including logs, construction diagram, pumping test analysis and water quality results. We also review reports from other contractors. See our borehole drilling in Kenya and Somalia services.

Frequently asked questions

What is a borehole completion report?

It is the record of how a borehole was drilled, built and tested. It includes the geological log, casing and screen details, water levels, pumping test results, water quality and recommendations for the pump.

Why do I need a borehole completion report?

You need it to choose the right pump, to apply for water permits, to plan maintenance and to diagnose problems later. Without it, anyone working on the borehole is guessing.

What is safe yield?

Safe yield is the rate at which the borehole can be pumped over the long term without the water level falling below the pump or damaging the aquifer. It is calculated from pumping test data, not from the first water strike.

💧 Water demand calculator

How much water does your borehole need to deliver each day? Enter your numbers for a quick planning estimate.

0litres per day
0suggested tank (litres)
0pump flow (m³/hour, solar)

Rough planning figures only, using typical daily use per person and per animal, with one day of storage and about 6 hours of good sun. Your test pumping result sets the final pump size.