When your borehole is finished, the driller should give you a borehole completion report. It is easily the most important document you will own about your water supply. It tells you how deep the borehole is, what it is made of, how much water it can give and whether that water is fit for use. Many owners never read it, and many reports are too thin to be useful. Here is what each part means and what to look for.
1. General information
- Borehole name or number, GPS coordinates and site address.
- Owner and permit reference numbers.
- Drilling contractor, rig type and drilling dates.
- Hydrogeologist or supervisor responsible.
Keep this page; it links the borehole to its permits and to the hydrogeological survey report.
2. The drilling log
The log describes the materials drilled through, metre by metre. A typical entry might read “12 to 24 m, weathered granite, brown, friable” or “48 to 60 m, fractured basalt, water strike at 52 m”. Look for:
- Lithology: soils, weathered rock, fresh rock, clay layers.
- Penetration rate: fast drilling often indicates softer or fractured zones.
- Water strikes: the depths where water was first found and any increase in flow.
- Air-lift yields during drilling, if air drilling was used. These are indicative only.
3. Construction details
| Item | What to check |
|---|---|
| Total depth | Final depth drilled and depth after construction |
| Drilling diameters | Diameter at each depth interval |
| Casing | Material (uPVC, steel), diameter, class and depth range |
| Screens | Depth intervals, slot size and material, matched to the water strikes |
| Gravel pack | Size and depth interval |
| Sanitary seal | Grout type and depth, normally in the top several metres |
| Headworks | Casing height above ground, cap, apron slab |
A simple diagram of the borehole construction should be included. If it is missing, ask for one. Our articles on casing and screen installation and gravel packing and sealing explain why these details matter.
4. Development
The report should record how the borehole was developed after construction (air-lifting, surging, jetting), for how long, and whether the water ran clear and sand-free at the end. See borehole development methods.
5. Water levels
- Static water level (SWL): the resting level before pumping.
- Dynamic or pumping water level: the level during pumping.
- Drawdown: the difference between the two.
Our guide to static and dynamic water levels and drawdown explains them in detail.
6. Pumping test results
This section is what tells you how much water you really have. A proper report includes:
- Step-drawdown test: pumping at increasing rates, to see how the borehole responds.
- Constant rate test: pumping at one rate for an extended period, often 24 to 72 hours depending on the use.
- Recovery test: how quickly the water level returns after pumping stops.
- Graphs of water level against time, and the calculated aquifer properties.
- The recommended safe yield and pumping hours.
Be wary of reports that give a yield without any pumping test data, or a yield based only on air-lifting during drilling. See step-drawdown and constant discharge tests.
7. Water quality
The report should include a laboratory analysis of a sample taken near the end of the pumping test, with:
- Physical parameters: colour, turbidity, pH, conductivity, total dissolved solids.
- Chemical parameters: hardness, chloride, sulphate, nitrate, iron, manganese and fluoride.
- Bacteriological results: total coliforms and E. coli.
- A comparison with the relevant drinking water standard.
If any value exceeds the standard, the report should say so clearly and recommend treatment. See groundwater quality assessment.
8. Pump recommendation
Finally, the report should recommend:
- Maximum pumping rate (m³/h) and hours per day.
- Pump setting depth, safely above the screens and below the expected pumping level.
- Pump type and duty point (flow and head).
Read borehole yield and pump selection for how these numbers are used.
Warning signs of a poor report
- A single page with depth and “yield: good”.
- No construction diagram.
- No pumping test graphs.
- No laboratory certificate for water quality.
- Screens placed where the log shows no water strikes.
How Quantum Geoconsultants can help
Every borehole we drill comes with a full completion report including logs, construction diagram, pumping test analysis and water quality results. We also review reports from other contractors. See our borehole drilling in Kenya and Somalia services.
Frequently asked questions
What is a borehole completion report?
It is the record of how a borehole was drilled, built and tested. It includes the geological log, casing and screen details, water levels, pumping test results, water quality and recommendations for the pump.
Why do I need a borehole completion report?
You need it to choose the right pump, to apply for water permits, to plan maintenance and to diagnose problems later. Without it, anyone working on the borehole is guessing.
What is safe yield?
Safe yield is the rate at which the borehole can be pumped over the long term without the water level falling below the pump or damaging the aquifer. It is calculated from pumping test data, not from the first water strike.
💧 Water demand calculator
How much water does your borehole need to deliver each day? Enter your numbers for a quick planning estimate.
Rough planning figures only, using typical daily use per person and per animal, with one day of storage and about 6 hours of good sun. Your test pumping result sets the final pump size.