Geotechnical Investigation for Road Projects: Subgrade, CBR and Materials

How road projects are investigated: alignment soils survey, trial pits and DCP, subgrade CBR, problem soils, cuttings and embankments, drainage, materials sources and how results feed pavement design.

By Quantum Geoconsultants geotechnical teamUpdated 20 November 20263 min read
Black cotton soil: swells & shrinksFirmer weathered layerRock Core box Know your ground before you build

🏗️ Geotechnical Engineering: a technical article by the Quantum Geoconsultants geotechnical team.

Roads are linear projects that cross many kinds of ground: black cotton plains, volcanic hills, river crossings, swamps and rock cuttings. A good geotechnical investigation for road projects tells the designer what the road will sit on, where it will need special treatment and where the construction materials will come from. This article explains what the investigation involves and how its results are used.

Objectives

Desk study and walkover

Geological and soil maps, satellite imagery, existing road records and local knowledge show where soils change and where problems are likely. A walkover along the alignment confirms features such as wet areas, rock outcrops, cracking soils and existing borrow pits. A topographic survey runs alongside.

Centreline soil survey

Trial pits

Trial pits are dug at regular intervals along the centreline, typically to 1.5 to 2 m, and at every change in soil type. Each pit is logged and sampled. See trial pits vs boreholes.

DCP probing

DCP tests between pits give a quick profile of strength with depth and show how uniform the subgrade is. They are also used to assess existing gravel or paved roads for rehabilitation.

Laboratory tests

Test Purpose
Grading Classification and material specification
Atterberg limits, linear shrinkage Plasticity and expansive potential
Compaction Density and moisture targets
CBR (soaked) and swell Subgrade strength for pavement design
Chemical tests Salts and sulphates in arid and coastal areas

Subgrade classification and design

Results are grouped into uniform sections along the road, each with a design subgrade CBR. Pavement design manuals then give layer thicknesses for each subgrade class and traffic level. Weak subgrades may be improved by importing better material, stabilisation or capping layers. See soil stabilisation with lime and cement.

Problem soils on roads

Expansive clays

Black cotton soil causes longitudinal cracking, roughness and edge failures. Common treatments include removal and replacement, lime stabilisation, raising the road on an embankment of selected fill and wide shoulders to reduce moisture changes. See black cotton soil.

Soft ground

Swamps and valley bottoms need deeper investigation with boreholes, vane tests or CPT to design embankments that will not fail or settle excessively. See soft clay.

Collapsible and saline soils

In arid areas, collapsible soils settle when wetted and salts can attack bituminous surfacing. See collapsible soils and sabkha soils.

Cuttings and embankments

Structures

Bridges, large culverts and retaining walls need boreholes at each foundation location, with SPT, sampling and rock coring. See bridge foundation investigations.

Construction materials

Roads use large volumes of gravel, sand, crushed rock and water. The investigation identifies borrow pits and quarries near the alignment, tests their quality and estimates quantities. See investigating quarries and borrow pits.

Drainage and groundwater

Record seepage, springs and groundwater in pits. Wet subgrades lose strength, so subsurface drains, raised formations and good side drains may be needed.

Reporting

How Quantum Geoconsultants can help

We carry out road investigations with trial pits, DCP, boreholes, geophysics, laboratory testing and materials surveys. See our geotechnical surveys in Kenya and Somalia.

Frequently asked questions

What does a road geotechnical investigation include?

Usually a centreline soil survey with trial pits and DCP probing, sampling for grading, plasticity, compaction and CBR, investigation of cuttings, embankments and structures, groundwater and drainage, and a search for construction materials.

How often are trial pits dug along a road?

Spacing depends on the project and soil variability. Many projects use regular intervals along the centreline, with closer spacing where soils change, plus DCP tests between pits.

Why is subgrade CBR so important?

The subgrade CBR largely determines the thickness of the pavement layers needed for the design traffic. Weak subgrades need thicker pavements or improvement, which affects cost significantly.

🏗️ Request a geotechnical survey quote

The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.

Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.