Utility-scale solar farms are growing across Kenya and the region, including in Garissa, Turkana, the Rift Valley and coastal areas, and smaller plants serve mines, factories and towns in Somalia. A solar farm may need tens of thousands of foundations for its mounting structures. Small changes in pile length or type multiply across the site. A focused geotechnical investigation for solar farms can save significant cost and avoid installation problems.
Key questions
- Can piles be driven or screwed, or will rock and cobbles require pre-drilling?
- How deep must piles be embedded to resist wind uplift and lateral loads?
- How corrosive is the ground to galvanised steel?
- Are there expansive, collapsible or soft soils?
- What are the thermal properties of soil for buried cables?
- How will drainage and flooding affect the site?
- What foundations do inverters, substations and buildings need?
Investigation scope
Desk study and walkover
Geology, topography, drainage, flood history, previous land use and access. A topographic or drone survey supports layout and grading.
Trial pits and boreholes
Distributed across the site to map soil types and depth to rock, with sampling. See trial pits vs boreholes.
DCP and CPT
Quick profiles of strength across many locations. See DCP testing.
Geophysics
Seismic refraction and ERT can map rock head and variability between pits, highlighting areas where pile refusal is likely.
Laboratory tests
- Classification, plasticity and swell. See Atterberg limits.
- Corrosivity: pH, chlorides, sulphates, resistivity, redox potential. See chemical testing.
- Thermal resistivity of soil for cable rating.
- Compaction and CBR for access roads.
Pile load testing
On-site pile tests are often the most valuable part of a solar investigation:
- Install trial piles of the proposed type (driven sections or screw piles) at locations representing different ground conditions.
- Record installation: driving time, blows or torque, and any refusal.
- Test in axial tension (pull-out), compression and lateral loading.
- Measure displacement against load and compare with design criteria.
Results allow pile embedment depths to be optimised for each ground zone, often reducing steel quantities. See pile load testing.
Common ground issues
Shallow rock and cobbles
Refusal of driven piles may require pre-drilling, grouted piles or ballasted foundations.
Expansive clays
Black cotton soils can heave piles, especially shallow ones. Embedment must reach below the active zone or resist uplift. See black cotton soil.
Collapsible and saline soils
Common in arid areas; can affect pile capacity and corrosion. See collapsible soils.
Flooding and erosion
Sheet floods and erosion can expose piles and damage cables. Drainage design and erosion protection are needed.
Corrosion design
Results from corrosivity tests are used to estimate steel loss over the design life and to set galvanising thickness, sacrificial steel allowance or coatings. Saline and acidic soils need particular care.
Other foundations
- Inverter stations and transformers: pads or rafts.
- Substations: heavier foundations and earthing grids; soil resistivity is important.
- Buildings and fences.
- Access roads: subgrade CBR and drainage. See road investigations.
How Quantum Geoconsultants can help
We carry out solar farm investigations with trial pits, boreholes, geophysics, pile testing and corrosivity testing. See our geotechnical surveys in Kenya and Somalia.
Frequently asked questions
Why do solar farms need a geotechnical investigation?
Solar arrays rely on thousands of small foundations, usually driven or screwed piles. Ground conditions control pile type, length, installation method, corrosion protection and cost across the whole site.
What is pile pull-out testing?
A field test where a trial pile is installed and loaded in tension, compression and lateral directions to measure its capacity in the actual ground, used to optimise pile embedment.
Why test soil corrosivity on solar sites?
Steel piles in contact with soil can corrode. Tests such as resistivity, pH, chlorides, sulphates and redox potential help estimate corrosion rates and set galvanising thickness or extra steel allowance.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.
Book a geotechnical survey in Kenya