Telecom masts and towers are now everywhere across Kenya and Somalia, from city rooftops to remote hilltops. Each one stands on foundations that must resist strong winds for decades. Because towers are tall and relatively light, the ground behaves very differently under them compared with buildings. A geotechnical survey for telecom masts provides the data to design safe, economical foundations.
Loads on mast foundations
- Overturning moment: wind on the tower and antennas creates large moments at the base.
- Uplift: on lattice towers, the windward legs are pulled upwards.
- Compression: leeward legs are pushed down.
- Shear: horizontal forces at the base.
- Cyclic loading: repeated wind loading over the life of the tower.
Guyed masts add tension loads on anchor blocks.
Typical investigation scope
- Desk study of geology and site access.
- At least one borehole at the tower position, or trial pits where shallow rock or firm ground is expected. See trial pits vs boreholes.
- SPT or DCP to measure strength with depth. See SPT N-values.
- Rock coring where rock is encountered.
- Groundwater observations.
- Laboratory tests: classification, plasticity, density, strength and chemical tests for concrete.
- Soil resistivity where earthing design is required.
Guyed masts need investigation at each anchor location as well as the base.
Foundation options
| Foundation type | When used |
|---|---|
| Pad and chimney (one per leg) | Firm soils or weathered rock at moderate depth |
| Raft (single base) | Monopoles and towers on moderate or variable ground |
| Bored piles | Soft or variable soils, high groundwater, high loads |
| Rock anchors | Shallow strong rock, often on hilltops |
| Rooftop frames | Building-mounted sites; need structural assessment |
Uplift resistance comes from the weight of the foundation and soil above it, and from shaft friction on piles or bond in anchors.
Common ground problems
Black cotton soil
Expansive clays can heave and shrink, rotating foundations and affecting tower alignment. Foundations should go below the active zone or use piles. See black cotton soil.
Soft or loose ground
Low-lying sites may have soft clays or loose sands that reduce bearing and uplift capacity.
Hilltop rock
Many tower sites are on hills with shallow rock. Rock quality matters: weathered or fractured rock may need deeper anchors. See rock core logging.
Slopes
Towers on or near slopes need assessment of slope stability and the effect of foundation loads. See slope stability assessment.
Aggressive ground
Coastal and arid sites may have sulphates and chlorides that attack concrete and steel. See sulphate and chloride testing.
Report contents
- Borehole and trial pit logs with test results.
- Groundwater level.
- Design parameters: unit weight, strength and friction angle for each layer.
- Allowable bearing pressure and uplift parameters.
- Recommended foundation type and depth.
- Concrete durability class.
- Soil resistivity for earthing, where required.
See how to read a geotechnical report.
Rolling out many sites
Network operators and tower companies often need investigations at many sites quickly. Standardised scopes, mobile crews, quick laboratory turnaround and consistent reporting templates help keep programmes on time while still recognising that each site’s ground is different.
How Quantum Geoconsultants can help
We carry out rapid, standardised geotechnical investigations for telecom sites across Kenya and Somalia. See our geotechnical surveys in Kenya and Somalia.
Frequently asked questions
Why do telecom masts need a soil investigation?
Masts are tall and light, so wind creates large overturning moments and uplift on foundations. Foundations must resist these forces on the actual ground, which varies from site to site.
What foundations are used for telecom towers?
Common options include pad and chimney foundations, rafts, bored piles and rock anchors, chosen according to soil strength, groundwater and tower type.
How long does a mast site investigation take?
Fieldwork at a single site often takes a day, using a borehole or trial pits plus field tests. Laboratory testing and reporting typically follow within one to two weeks.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.
Book a geotechnical survey in Kenya
Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.