Breakwater and Quay Wall Foundations: Ground Investigation Needs

What ground investigation breakwaters, revetments and quay walls need: bearing capacity and settlement under rock mounds, pile and sheet pile design, scour, slope stability and seismic considerations.

By Quantum Geoconsultants geotechnical teamUpdated 20 November 20263 min read
Black cotton soil: swells & shrinksFirmer weathered layerRock Core box Know your ground before you build

🏗️ Geotechnical Engineering: a technical article by the Quantum Geoconsultants geotechnical team.

Breakwaters protect harbours from waves. Quay walls provide berths for ships. Both are heavy, long structures built on seabed soils that are often weak, variable or difficult to investigate. Their foundations must carry large loads, resist waves and currents and remain stable for decades. This article outlines the ground investigation needs of breakwater and quay wall foundations.

Breakwaters and revetments

How they load the ground

Rubble mound breakwaters are large piles of quarried rock with armour units on the outside. They are wide and heavy, putting high pressure over a large area of seabed. Key ground issues are:

Investigation

Where soft clay is thick, solutions may include staged construction, removal and replacement, or ground improvement before placing the mound.

Quay walls

Gravity walls

Concrete blocks or caissons sit on a rock bedding layer on the seabed. They rely on their weight to resist earth pressure, wave and mooring forces. They need firm founding strata, as they are sensitive to settlement and sliding.

Sheet pile walls

Steel sheet piles are driven into the seabed and anchored back to the land. Design depends on soil strength along the full pile length and the driveability of the piles. Hard layers, boulders and rock limit driving.

Open piled decks

A concrete deck is supported on steel or concrete piles, with a revetment slope below. Design depends on pile capacity in the seabed soils and rock, and lateral loads from berthing and mooring. See types of pile foundations.

Investigation needs

Wall type Key ground information
Gravity wall Strength and stiffness of founding stratum, settlement, sliding resistance
Sheet pile wall Soil strength profile, earth pressures, driveability, rock level
Piled deck Pile shaft and base resistance, rock level and quality, lateral soil response

Common ground challenges

Coral limestone

Along the East African and Somali coasts, coral limestone can be strong but cavernous and variably cemented. Driven piles may meet sudden refusal or drop into voids. Drilling must go deep enough to prove continuous rock. See logging marine boreholes.

Calcareous sands

Driven pile shaft friction can be much lower in calcareous sands than in silica sands. Carbonate content testing is essential.

Soft marine clays

Low strength and high compressibility affect breakwater stability and quay wall design.

Scour

Fine sands and silts erode easily under waves and propeller wash. Particle size and erosion tests, and toe protection design, are needed.

Earthquakes

Parts of the Gulf of Aden region are seismically active. Loose saturated sands may liquefy, and quay walls must be checked for seismic earth pressures.

Laboratory testing

How Quantum Geoconsultants can help

We plan and carry out nearshore investigations for breakwaters, quay walls and jetties. See our guides to port geotechnical investigations and nearshore drilling platforms, and our work in Somalia.

Frequently asked questions

What ground information does a breakwater need?

The strength and compressibility of seabed soils under the rock mound, the depth to firm strata or rock, and properties for slope stability, settlement and scour assessment.

What foundations are used for quay walls?

Common types include gravity walls of concrete blocks or caissons on prepared rock beds, sheet pile walls with anchors, and open piled decks on steel or concrete piles.

Why is scour important?

Waves, currents and ship propellers can erode seabed material at the toe of breakwaters and quay walls, undermining them. Investigation and design must consider erodibility and toe protection.

🏗️ Request a geotechnical survey quote

The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.

Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.

Book a geotechnical survey in Kenya

Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.

💬 WhatsApp