Get a Quote
← All articles

Storing and Transporting Soil and Rock Samples to the Lab

Good practice for labelling, sealing, storing and transporting geotechnical soil and rock samples from site to laboratory, including undisturbed tubes, core boxes, water samples and chain of custody.

By Quantum Geoconsultants geotechnical teamUpdated 20 November 20264 min read
Black cotton soil: swells & shrinksFirmer weathered layerRock Core box Know your ground before you build

🏗️ Geotechnical Engineering: a technical article by the Quantum Geoconsultants geotechnical team.

A geotechnical investigation can cost a lot in drilling, rigs and crew time. Yet the value of that investment often depends on what happens to the samples in the hours and days after they come out of the ground. Samples left in the sun, poorly labelled or bounced on the back of a pickup can give test results that are wrong. This article covers good practice for storing and transporting soil and rock samples from site to laboratory.

Why it matters

Laboratory tests assume the sample represents the ground. Several things can change a sample after it is taken:

BS 5930 and BS EN ISO 22475-1 set out requirements for sampling, handling and transport. See our guide to BS 5930.

Labelling

Every sample should be labelled at the moment it is taken, with waterproof labels and markers, inside and outside the container. A label should include:

Record each sample on the field log and on a sample register, so the laboratory can check what they receive against what was taken.

Disturbed and bulk samples

Undisturbed tube samples

  1. Clean the ends of the tube and remove any disturbed material.
  2. Seal both ends with molten wax, at least about 25 mm thick, then fit tight caps and tape.
  3. Mark top and bottom, and label clearly.
  4. Store and transport upright, in padded racks or boxes.
  5. Keep out of the sun and away from heat sources.
  6. Avoid vibration: no loose tubes in the back of vehicles.

Soft marine clays are especially sensitive. See logging marine boreholes for over-water practice.

Rock core

See rock core logging for what should be recorded before transport.

Water samples

See groundwater quality assessment.

Storage on site

Transport

Risk Control
Heat in vehicles Cover samples, avoid parking in sun, use insulated boxes for sensitive samples
Vibration on rough roads Padded racks, upright tubes, drive carefully
Loss or theft Locked vehicle, sample register checked at loading and delivery
Long distances Plan routes, consider air freight for remote sites, seal samples very well
Cross-border shipment Check export and import permits, especially for mineral samples

Chain of custody

A chain-of-custody form travels with the samples and records who handled them and when, from site to laboratory. It is essential for mineral exploration assays and good practice for any important project. See QA/QC in mineral exploration.

At the laboratory

On arrival, the laboratory should check samples against the register, note any damage or missing items, and store them correctly. Report any problems to the engineer quickly, so samples can be retaken while the rig is still on site if necessary.

How Quantum Geoconsultants can help

Our field teams follow BS 5930 and ISO sampling practice, with sample registers, core photography and controlled transport to accredited laboratories. See our geotechnical surveys in Kenya and Somalia.

Frequently asked questions

How should undisturbed soil samples be stored?

Sealed at both ends with wax and caps to keep the natural moisture, labelled with top and bottom marked, kept upright, protected from heat, frost and vibration, and tested as soon as practical.

How long can soil samples be stored before testing?

As short a time as possible. Moisture-sensitive and undisturbed samples can change within days if poorly sealed. Even well-sealed samples should be tested within a few weeks.

Why does sample transport matter?

Rough handling, heat and drying change the soil's structure and moisture content. Test results from damaged samples can be misleading and lead to wrong design decisions.

🏗️ Request a geotechnical survey quote

The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.

Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.

Book a geotechnical survey in Kenya

Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.

💬 WhatsApp