A hydrogeological survey report is the document that tells you where to drill, how deep to go and what kind of water you can expect. In Kenya it is also a key part of the borehole permit application, and in Somalia it is often required by donors and NGOs before they fund drilling. Yet many clients receive a report, file it and never read it properly. This checklist explains what a good report should contain, so you can judge whether yours is worth the money you paid for it.
Why the report matters
Drilling is the expensive part of a borehole project. A dry or low-yielding borehole costs almost as much as a successful one, so the survey is your best tool for reducing risk. The report is where the hydrogeologist puts that risk assessment in writing. If it is vague, you have very little to go on when choosing a drilling depth, setting a budget or deciding whether to drill at all.
The report is also the reference document for the drilling contractor. A clear report helps the driller set up at the right point, expect the right formations and know when to stop.
The checklist
1. Client, site and purpose
- Client name and the intended water use (domestic, livestock, irrigation, institutional, commercial).
- Estimated daily water demand in cubic metres per day. Without this, nobody can say whether the expected yield is enough.
- Site location with GPS coordinates, plot or LR number where available, and a location map.
- Date of the field survey and the names and qualifications of the people who carried it out.
2. Desk study and regional setting
A good report starts with what is already known. It should cover:
- Climate and rainfall, which control recharge.
- Topography and drainage, including rivers, valleys and seasonal streams near the site.
- Regional geology from published geological maps, with the main rock and soil units described.
- Hydrogeology: the likely aquifer types (weathered basement, fractured volcanics, sedimentary sands, coastal limestone) and how groundwater moves through them. See our guide to aquifer types.
- Existing boreholes nearby, with their depths, yields and water quality where records exist. This is one of the most valuable parts of any report.
3. Field reconnaissance
The report should describe what the team saw on the ground: rock outcrops, fracture directions, vegetation that indicates shallow water, springs, existing wells, sources of contamination such as pit latrines, septic tanks and fuel stations, and access for a drilling rig.
4. Geophysical survey data
Most hydrogeological surveys in East Africa use electrical resistivity, usually vertical electrical sounding (VES) and sometimes profiling or 2D ERT. The report should include:
- A map showing where each sounding or profile was taken, with coordinates.
- The method, equipment and electrode array used.
- The field curves or sections, not just a summary sentence.
- An interpretation table giving the resistivity and thickness of each layer, and what each layer is thought to be.
If a report gives only one sounding and no curve, ask why. One point gives very little basis for choosing between sites.
5. Interpretation and recommended drilling site
This is the heart of the report. It should state clearly:
- The recommended drilling point, marked on a map and pegged on site, with an alternative site if the first fails.
- The recommended drilling depth, or a depth range, with the reasoning.
- The expected water strike depths and aquifer type.
- The likely yield range in cubic metres per hour, based on the geology and nearby boreholes.
- The expected water quality, especially where salinity or fluoride are known problems.
6. Borehole design recommendations
A good report recommends drilling diameter, casing and screen type, gravel pack and sanitary seal. Our articles on casing and screens and gravel packing and sealing explain why these details matter.
7. Testing and water quality requirements
The report should state that the completed borehole needs a pumping test and laboratory water analysis before a pump is chosen, and how long the test should run.
8. Risks, limitations and environmental notes
Every report should be honest about uncertainty. Look for a section that explains the limits of the geophysical method, the chance of a low yield, the risk of saline water and any impact on neighbouring boreholes.
9. Signature and qualifications
The report should be signed by a qualified hydrogeologist. In Kenya, permit applications are reviewed by the Water Resources Authority, so check that the author meets current WRA requirements.
Red flags in a hydrogeological survey report
| Red flag | Why it matters |
|---|---|
| No field curves or raw data | You cannot check the interpretation or get a second opinion. |
| Guaranteed yield or “100% water” | No survey can guarantee water. It suggests the author is overselling. |
| No mention of nearby boreholes | The most reliable local evidence has been ignored. |
| Copied text with another site’s name | The report may be a template rather than a site-specific study. |
| No contamination sources noted | Your borehole could be sited close to a latrine or septic tank. |
| Single recommended depth with no range | Geology varies. A range gives the driller and client room to decide. |
Questions to ask your hydrogeologist
- How many soundings did you take, and why did you choose this point over the others?
- What are the depths and yields of the nearest boreholes?
- What is the chance that the yield will be below my daily demand?
- Is there any salinity or fluoride risk in this area?
- If the first site is dry, what is the alternative?
How Quantum Geoconsultants can help
Our hydrogeological surveys in Kenya and Somalia include full field data, interpreted sections, a pegged drilling point and an honest statement of risk. Read our complete guide to hydrogeological surveys or contact us to discuss your site.
Frequently asked questions
Is a hydrogeological survey report required before drilling a borehole in Kenya?
Yes. The Water Resources Authority normally expects a hydrogeological survey report prepared by a qualified hydrogeologist as part of the application to drill. Check the current requirements with WRA before you start.
How long is a hydrogeological survey report valid?
Reports are tied to a specific site and the conditions at the time of survey. If drilling is delayed for a long period or the planned location changes, ask the hydrogeologist whether the report needs updating.
Can a report guarantee that a borehole will find water?
No honest report can guarantee water. A good report gives a recommended site, an expected depth range, a likely yield range and a clear statement of risk, based on the geology and geophysical data.
💧 Water demand calculator
How much water does your borehole need to deliver each day? Enter your numbers for a quick planning estimate.
Rough planning figures only, using typical daily use per person and per animal, with one day of storage and about 6 hours of good sun. Your test pumping result sets the final pump size.