Sooner or later, a mineral project that shows promise will need to attract investors, partners or a buyer. At that point, the quality of the data collected from the very first sample matters. Two reporting standards dominate the industry: Australia’s JORC Code and Canada’s NI 43-101. Both are part of the CRIRSCO family of international reporting standards. This article explains what they mean for early-stage explorers in Kenya, Somalia and the wider region.
This is a general overview. Refer to the current editions of the codes and take professional advice for any public reporting.
Why reporting standards exist
History has many examples of mining projects promoted with exaggerated or misleading claims. Reporting codes protect investors by requiring that public statements about exploration results, resources and reserves are based on adequate data and signed off by qualified professionals. They are built on principles of transparency, materiality and competence.
Competent Person and Qualified Person
- Under JORC, public reports must be based on work by a Competent Person: a member of a recognised professional organisation with relevant experience in the style of mineralisation and type of activity.
- Under NI 43-101, a Qualified Person fills a similar role, with defined professional and experience requirements.
Both take personal responsibility for what is reported.
Categories of information
| Category | What it means |
|---|---|
| Exploration Results | Data such as sample and drill results that do not yet support a resource estimate |
| Exploration Target | A range of potential tonnage and grade, clearly stated as conceptual (JORC) |
| Mineral Resource (Inferred, Indicated, Measured) | Concentrations with reasonable prospects for eventual economic extraction, in increasing order of confidence |
| Ore / Mineral Reserve (Probable, Proved) | The economically mineable part of a resource, after applying modifying factors |
Moving from exploration results to resources and reserves requires progressively more data, better geological understanding and technical and economic studies. See resource estimation and geological modelling.
What early-stage explorers should do now
1. Keep complete records
- Sample locations with accurate coordinates and the coordinate system used. See coordinate systems.
- Sample type, size, method and who collected it.
- Geological descriptions and photos.
- Drill collar surveys, downhole surveys and logs.
2. Use proper sampling methods
Representative samples, consistent intervals and appropriate sample sizes. See sampling techniques and quality assurance.
3. Run QA/QC from the start
Insert certified standards, blanks and duplicates, and monitor results. See QA/QC in mineral exploration.
4. Use accredited laboratories
Document sample preparation and analytical methods. See choosing an assay laboratory.
5. Maintain chain of custody
Record sample security from field to laboratory.
6. Build a proper database
Store data in a structured, validated database rather than scattered spreadsheets. Keep original assay certificates.
7. Be careful with field tools
Portable XRF and visual estimates are useful for decisions but should be clearly labelled and not presented as assay results. See portable XRF.
Common problems that reduce project value
- Historical samples with no locations, methods or certificates.
- Selective “grab” samples presented as representative grades.
- No QA/QC, so results cannot be relied on.
- Drill holes without downhole surveys.
- Poor core recovery not recorded. See core recovery and RQD.
- Inconsistent coordinate systems.
Data with these problems may have to be excluded from resource estimates or re-collected, at great cost.
JORC Table 1 and NI 43-101 technical reports
JORC requires a checklist known as Table 1, covering sampling techniques, drilling, data management, geology, estimation and more. NI 43-101 requires technical reports in a prescribed format for certain disclosures. Collecting data with these checklists in mind from the start makes future reporting much easier.
Local regulation
Reporting codes do not replace national requirements. In Kenya, exploration licences under the Mining Act 2016 come with reporting obligations to the government. In Somalia, requirements depend on the responsible authorities. See mineral exploration in Somalia.
How Quantum Geoconsultants can help
We set up sampling, drilling and QA/QC programmes that produce data fit for future resource reporting. See our mineral exploration services and exploration geophysics.
Frequently asked questions
What is the JORC Code?
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. It sets minimum standards for public reporting of exploration and mining information and is widely used internationally.
What is NI 43-101?
Canada's National Instrument 43-101, a rule governing how companies listed in Canada disclose scientific and technical information about mineral projects, including technical report requirements.
Do private companies need to follow JORC or NI 43-101?
They are mandatory for public reporting by companies listed on certain exchanges. Private explorers are not always required to follow them, but collecting data to these standards makes projects far more attractive to investors and buyers.
📡 Request a geophysical survey quote
The cost of a geophysical survey depends mainly on the area or length of survey lines, the methods and depth of investigation needed, and site access. Tell us about your project and we will propose a survey design and quotation.
We reply with a proposed survey design and quotation. Prices are not listed online because every site and target is different.
Plan your geophysical survey
Tell us your site, target and depth of interest. We will recommend the right methods and send a survey design and quotation.