Every geotechnical investigation has to decide how to look at the ground. The two most common methods are trial pits and boreholes. Each has strengths and limitations, and most good investigations use both. This article compares them and explains when each is the right choice.
Trial pits
A trial pit is excavated with a backhoe or tracked excavator, or by hand on small sites. Typical depths are 1.5 to 4 m, limited by the excavator reach, ground stability and groundwater.
Advantages
- See the ground in place: the soil profile, layering, fissures, roots, fill and old foundations are visible across a large face.
- Large samples: bulk samples for compaction, CBR and grading.
- Quick and economical for shallow depths.
- Good for fill and made ground, where boreholes may give misleading small samples.
- Allow in-situ tests such as hand vane, DCP from the base, plate load tests and soakaway tests.
- Show excavation behaviour: how stable the sides are and how hard the digging is.
Limitations
- Limited depth.
- Difficult or impossible below the water table in sands and gravels.
- Disturbance of a wide area, which must be backfilled and compacted carefully, especially under future foundations.
- Safety risks from collapse.
Boreholes
Geotechnical boreholes are drilled by shell and auger, rotary coring or other methods. See drilling fluids and borehole depth.
Advantages
- Depth: tens of metres or more, reaching deep founding layers and rock.
- In-situ testing at depth, especially SPT and permeability tests.
- Undisturbed samples of clays for strength and consolidation tests.
- Rock coring for rock quality and strength.
- Groundwater: piezometers can be installed for long-term monitoring. See installing piezometers.
- Small footprint, useful on built-up sites and over water.
Limitations
- Higher cost per point and more mobilisation.
- Small samples; layering and features such as fissures are harder to see.
- Results depend heavily on driller skill and supervision.
Comparison
| Factor | Trial pit | Borehole |
|---|---|---|
| Typical depth | 1.5 to 4 m | 5 to 50 m or more |
| View of ground | Excellent, large face | Limited to samples and core |
| Sample types | Bulk, block undisturbed | Disturbed, tube undisturbed, rock core |
| Below water table | Difficult | Routine |
| Rock | Only very weak or weathered | Coring through strong rock |
| Cost per point | Lower | Higher |
| Speed | Several per day | One to a few per day |
| Site disturbance | Larger | Small |
When to use trial pits
- Houses and light buildings with shallow foundations. See soil tests for houses.
- Roads, car parks and yards, for subgrade and CBR sampling. See CBR testing.
- Borrow pits and material sources.
- Investigating fill, old foundations and buried obstructions.
- Measuring the depth of black cotton soil.
- Soakaway and infiltration testing.
When to use boreholes
- Multi-storey buildings, bridges, towers and tanks.
- Pile foundations and deep basements.
- Sites with high groundwater.
- Where rock must be proved and cored.
- Soft clay sites needing undisturbed samples.
- Over-water and confined urban sites.
Using both together
A combined approach is often best: trial pits to understand the shallow ground cheaply across the site, and boreholes at key locations to go deep. Probing, CPT and geophysics can fill gaps between them. See how many boreholes an investigation needs.
Safety in trial pits
- Do not enter unsupported pits deeper than about 1.2 m.
- Keep spoil and plant back from the edge.
- Fence or cover open pits, and backfill them promptly.
- Locate buried services before digging.
- Watch for groundwater inflow and side collapse.
Backfilling
Trial pits under future foundations or pavements must be backfilled in compacted layers, or the foundation design must account for them. Record their exact positions so the design team knows where they are.
How Quantum Geoconsultants can help
We design investigations that combine trial pits, boreholes, probing and geophysics to suit the project. See our geotechnical surveys in Kenya and Somalia.
Frequently asked questions
What is a trial pit?
A shallow excavation, usually dug by excavator or by hand to about 1.5 to 4 m, that lets engineers see, log, photograph and sample the soil in place.
Are trial pits cheaper than boreholes?
Generally yes, especially where an excavator is already available. They are quick to dig and log. But they are limited in depth and difficult below the water table.
Can I enter a trial pit to inspect it?
Only if it is properly supported or battered back and judged safe by a competent person. Unsupported pits deeper than about 1.2 m can collapse without warning, and most logging should be done from the surface.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.
Book a geotechnical survey in Kenya
Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.