Get a Quote
← All articles

Trial Pits vs Boreholes: Choosing the Right Investigation Method

Comparing trial pits and boreholes for geotechnical site investigation: depth, information quality, sampling, groundwater, cost, safety and when to use each or both.

By Quantum Geoconsultants geotechnical teamUpdated 20 November 20263 min read
Black cotton soil: swells & shrinksFirmer weathered layerRock Core box Know your ground before you build

🏗️ Geotechnical Engineering: a technical article by the Quantum Geoconsultants geotechnical team.

Every geotechnical investigation has to decide how to look at the ground. The two most common methods are trial pits and boreholes. Each has strengths and limitations, and most good investigations use both. This article compares them and explains when each is the right choice.

Trial pits

A trial pit is excavated with a backhoe or tracked excavator, or by hand on small sites. Typical depths are 1.5 to 4 m, limited by the excavator reach, ground stability and groundwater.

Advantages

Limitations

Boreholes

Geotechnical boreholes are drilled by shell and auger, rotary coring or other methods. See drilling fluids and borehole depth.

Advantages

Limitations

Comparison

Factor Trial pit Borehole
Typical depth 1.5 to 4 m 5 to 50 m or more
View of ground Excellent, large face Limited to samples and core
Sample types Bulk, block undisturbed Disturbed, tube undisturbed, rock core
Below water table Difficult Routine
Rock Only very weak or weathered Coring through strong rock
Cost per point Lower Higher
Speed Several per day One to a few per day
Site disturbance Larger Small

When to use trial pits

When to use boreholes

Using both together

A combined approach is often best: trial pits to understand the shallow ground cheaply across the site, and boreholes at key locations to go deep. Probing, CPT and geophysics can fill gaps between them. See how many boreholes an investigation needs.

Safety in trial pits

Backfilling

Trial pits under future foundations or pavements must be backfilled in compacted layers, or the foundation design must account for them. Record their exact positions so the design team knows where they are.

How Quantum Geoconsultants can help

We design investigations that combine trial pits, boreholes, probing and geophysics to suit the project. See our geotechnical surveys in Kenya and Somalia.

Frequently asked questions

What is a trial pit?

A shallow excavation, usually dug by excavator or by hand to about 1.5 to 4 m, that lets engineers see, log, photograph and sample the soil in place.

Are trial pits cheaper than boreholes?

Generally yes, especially where an excavator is already available. They are quick to dig and log. But they are limited in depth and difficult below the water table.

Can I enter a trial pit to inspect it?

Only if it is properly supported or battered back and judged safe by a competent person. Unsupported pits deeper than about 1.2 m can collapse without warning, and most logging should be done from the surface.

🏗️ Request a geotechnical survey quote

The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.

Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.

Book a geotechnical survey in Kenya

Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.

💬 WhatsApp