Geotechnical drilling over water, for ports, jetties, bridges and coastal structures, combines the hazards of drilling with the hazards of the sea. Platforms can move, weather changes quickly and a fall overboard can be fatal. Good planning and discipline keep crews safe. This article sets out the key hazards and controls for over-water drilling operations.
Planning
- Risk assessment and method statement for every stage: mobilisation, transit, positioning, drilling, sampling and demobilisation.
- Platform selection and engineering: jack-up legs, pontoon buoyancy, deck loads and moorings checked by competent people. See nearshore drilling platforms.
- Weather and sea state limits agreed in advance for working and for evacuation.
- Emergency response plan, including man overboard, medical evacuation and platform evacuation.
- Permits and notifications to port and maritime authorities.
- Competent crew with marine safety training and swimming ability where required.
Key hazards and controls
| Hazard | Controls |
|---|---|
| Falling overboard | Handrails and toe boards, life jackets at all times, restricted edge access, safety boat on standby |
| Platform instability | Engineered platform, jack-up pre-loading and leg checks, load management, monitoring of tilt and leg penetration |
| Weather and sea state | Forecasts, on-site monitoring, stop-work limits, safe haven plans |
| Rotating equipment | Guards, emergency stops, exclusion zones, no loose clothing |
| Lifting operations | Lift plans, certified equipment, competent banksmen, tag lines |
| Slips and trips | Non-slip decking, tidy deck, secured hoses and cables |
| Transfers between vessels | Calm-water transfers, ladders and gangways, transfer procedures |
| Heat and sun | Shade, water, rest breaks, sun protection |
| Fuel and chemicals | Secure storage, spill kits, bunding |
| Vessel traffic | Navigation lights and markers, notices to mariners, radio watch |
Standard drill site hazards also apply. See drill site safety.
Life-saving equipment
- Life jackets or buoyancy work vests for everyone on deck.
- Lifebuoys with lines at accessible points.
- Rescue boat with trained crew and engine checked daily.
- First aid kit and trained first aiders.
- Communication: radios and phones with charged batteries.
- Fire extinguishers and fire blankets.
Weather monitoring
Along the East African and Somali coasts, monsoon seasons bring strong winds and swell. Working windows should be planned seasonally and checked daily. On site, wind speed, wave height and current should be monitored, and the supervisor should have clear authority to stop work. Jack-ups need extra caution when elevating and lowering.
Daily routines
- Toolbox talk covering the day’s tasks, weather and hazards.
- Pre-start checks of platform, safety equipment, rig and boat.
- Headcount at the start and end of each shift and on every transfer.
- Regular checks of moorings, legs and deck loading.
- End-of-day securing of equipment and samples.
Environmental protection
- Closed-loop drilling fluid systems and containment. See drilling fluids.
- No discharge of fuel, oil or waste to the sea.
- Spill response equipment on board.
- Care around coral reefs, seagrass and other sensitive habitats.
Data quality and safety together
Safe operations also produce better data. Calm, well-managed platforms give better samples and more reliable depth records. See logging marine boreholes.
How Quantum Geoconsultants can help
We plan and supervise nearshore investigations with safety and data quality at the centre. See our port investigations and geotechnical surveys in Somalia.
Frequently asked questions
What are the main hazards of over-water drilling?
Drowning and man overboard, platform instability or collapse, bad weather and sea state, rotating and lifting equipment, slips and falls on wet decks, heat stress, and transfers between boats and platforms.
What PPE is needed for marine drilling?
In addition to standard drilling PPE such as helmets, boots, gloves and eye protection, workers over water need properly fitted life jackets or work vests, and sometimes personal locator beacons.
When should over-water drilling stop?
When agreed limits for wind, waves, swell, currents or visibility are exceeded, when the platform shows movement or instability, or when any safety system is not working.
🏗️ Request a geotechnical survey quote
The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.
Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.
Book a geotechnical survey in Kenya
Know your ground before you build. Send us your site location and project details and we will propose an investigation programme and quotation.