What a geotechnical site investigation involves, the standards behind it (BS 5930, Eurocode 7) and why it should always come before construction.

By Quantum Geoconsultants geotechnical teamUpdated 19 November 20266 min read
Black cotton soil: swells & shrinksFirmer weathered layerRock Core box Know your ground before you build

🏗️ Geotechnical Engineering: a technical article by the Quantum Geoconsultants geotechnical team.

Every building, road, bridge, water tower and dam rests on the ground, and the ground is the one construction material nobody chooses. A geotechnical site investigation finds out what that ground is made of, how strong it is, how much it will settle and how water moves through it, so engineers can design foundations that are safe and economical. This article explains what a site investigation involves, the standards behind it and why it should always come before construction.

What is a geotechnical site investigation?

A geotechnical site investigation (also called a ground investigation, soil investigation or soil test) is a planned programme of desk study, fieldwork and laboratory testing that describes the soil, rock and groundwater beneath a site. It answers the questions a structural or civil engineer needs answered before designing anything that loads the ground:

Why a site investigation matters before construction

Unexpected ground conditions are one of the most common causes of construction delays, cost overruns and structural damage. Cracked walls, sinking floor slabs, tilting buildings and failed retaining walls can very often be traced back to ground that was never properly investigated. A site investigation usually costs a small fraction of a project’s budget, yet it:

Common ground problems a site investigation reveals

East Africa has several ground conditions that regularly cause trouble when they are not investigated:

The standards behind a site investigation

Professional site investigations follow recognised codes so that results are reliable and accepted by engineers, authorities and funders. The main ones used in Kenya and the region are:

The stages of a geotechnical site investigation

1. Desk study

Before anyone goes to site, the engineer reviews geological maps, previous investigations nearby, satellite images, old land uses and the proposed structure. The desk study identifies likely ground conditions and hazards, and shapes the fieldwork plan.

2. Site walkover

A geotechnical engineer or engineering geologist walks the site to check access, look at exposures, cracks in nearby buildings, drainage, slopes and vegetation, and confirm where boreholes and trial pits can go. A topographic survey is often done at this stage so levels and positions are known.

3. Fieldwork

The main investigation combines several techniques:

4. Laboratory testing

Samples are tested to measure the properties used in design: moisture content, particle size distribution, Atterberg limits (plasticity), free swell and swell pressure for expansive clays, compaction and California Bearing Ratio (CBR) for roads, shear strength (triaxial or shear box), consolidation for settlement, and chemical tests for sulphates, chlorides and pH.

5. Reporting

The results are presented in two parts. The factual report contains borehole and trial pit logs, test results and site plans. The interpretive report (called the Ground Investigation Report under Eurocode 7) explains what the results mean: the ground model, design parameters, bearing capacity, expected settlement, recommended foundation type and depth, concrete protection and any construction risks.

How many boreholes, and how deep?

There is no single answer, because it depends on the structure, the loads and the variability of the ground. As a guide, Eurocode 7 Part 2 suggests investigation points at roughly 15 to 40 metres apart for high-rise and industrial buildings, and wider spacing for large open areas and roads. For pad and strip footings, investigation should usually extend to at least three times the footing width and not less than about 6 metres below the foundation, and deeper for rafts, piles and heavy structures. A small house on uniform ground may need only two or three boreholes or trial pits, while a high-rise or a dam needs a much more detailed programme.

What a site investigation costs and how long it takes

The cost depends on the number and depth of boreholes, the in-situ and laboratory tests needed, site access and distance. Fieldwork for a typical building plot takes a few days, laboratory testing one to three weeks, and the report follows soon after. Compared with the cost of repairing a cracked building or redesigning foundations during construction, a site investigation is one of the best-value steps in any project.

When should you commission a site investigation?

As early as possible: ideally once the site is chosen and the building’s size and layout are known, and before the structural design is finalised. Early investigation lets the design team choose the most economical foundation from the start. A second, more detailed phase can follow once the final layout is fixed.

How Quantum Geoconsultants can help

Quantum Geoconsultants carries out geotechnical site investigations to BS 5930 and Eurocode 7, from desk study and drilling to laboratory testing and clear design recommendations. We work across Kenya from our Nairobi base, and our personnel also have experience working in Somalia.

Planning a project? Send us your site location and building details and we will propose an investigation programme and quotation.

Frequently asked questions

What is a geotechnical site investigation?

It is a planned programme of desk study, fieldwork and laboratory testing that describes the soil, rock and groundwater beneath a site, so engineers can design safe and economical foundations.

Is a soil test required before construction in Kenya?

The National Building Code 2024 expects soil investigation before construction, and lenders, insurers and donors increasingly ask for a geotechnical report.

Which standards apply to site investigations?

The main ones are BS 5930 for ground investigation, Eurocode 7 (BS EN 1997) for geotechnical design, BS 1377 and BS EN ISO 17892 for laboratory tests, and BS EN ISO 14688 and 14689 for soil and rock classification.

How long does a site investigation take?

Fieldwork for a typical building plot takes a few days, laboratory testing one to three weeks, and the report follows soon after.

🏗️ Request a geotechnical survey quote

The scope and cost of a geotechnical investigation depend on the size and type of structure, the site area and the ground conditions. Tell us about your project and we will propose an investigation programme and quotation.

Under the National Building Code 2024, soil testing is now expected before construction. We reply with a proposed programme and quotation.

Book a geotechnical survey in Kenya